FHWA NBI 2024 Inspection record Public-domain dataset

FAI 70 EB

Carrying FAI 70 EB over MID FK SHOAL CREEK

2.3 MI E POCAHONTAS, Bond, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: FAI 70 EB

The FAI 70 EB bridge in Bond, Illinois carries FAI 70 EB over MID FK SHOAL CREEK. It was built in 1967, making it 59 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 129.8 meters (426 feet) end to end. Daily traffic averages 13,100 vehicles, placing it in the heavily-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 28.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAI 70 EB compares

▼ 6.1
Load rating vs Illinois average (34.6 t)
Bottom 18%
Lower load rating than 82% of Illinois bridges
165
Bridges in Bond · 12 in Poor condition
FAI 70 EB 28.5 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
72.8 / 100 - historical 50–79.9 band
Structural adequacy /55
42.5
Serviceability /30
19.0
Essentiality /15
11.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
28.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Steel Continuous
Number of Spans
4
Structure Length
129.8 m (426 ft)
Deck Width
11.0 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,100 vehicles/day
Structure Number
003000300000000

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

FAI 70 EB is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FAI 70 EB against other structures in Bond and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAI 70 EB?

FAI 70 EB in Bond, Illinois has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FAI 70 EB inspected?

FAI 70 EB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAI 70 EB is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAI 70 EB?

FAI 70 EB has an NBI inventory load rating of 28.5 metric tons.

Who is responsible for maintaining FAI 70 EB?

FAI 70 EB is owned and maintained by State Highway Agency.

How old is FAI 70 EB and does age affect safety?

FAI 70 EB was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.