FHWA NBI 2024 Inspection record Public-domain dataset

RAMP 78EB 1A

Carrying RAMP 78EB 1A over HALAWA STRM HIC STRUC #9

0.02MI SE/STRUCT #3A, Honolulu, Hawaii

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
21 t Inventory load rating

Bridge Snapshot: RAMP 78EB 1A

The RAMP 78EB 1A bridge in Honolulu, Hawaii carries RAMP 78EB 1A over HALAWA STRM HIC STRUC #9. It was built in 1974, making it 52 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 38.7 meters (127 feet) end to end. Daily traffic averages 37,170 vehicles, placing it in the heavily-trafficked tier of Hawaii bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 20.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RAMP 78EB 1A compares

▼ 12.3
Load rating vs Hawaii average (33.2 t)
Bottom 19%
Lower load rating than 81% of Hawaii bridges
686
Bridges in Honolulu · 47 in Poor condition
RAMP 78EB 1A 20.9 t
Hawaii average 33.2 t

Live comparison across Hawaii.

Historical Sufficiency Rating

PlainBridge-computed
76.8 / 100 - historical 50–79.9 band
Structural adequacy /55
42.3
Serviceability /30
24.0
Essentiality /15
10.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
20.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1974
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
38.7 m (127 ft)
Deck Width
15.2 m (50 ft)
Owner
State Highway Agency
Avg Daily Traffic
37,170 vehicles/day
Structure Number
003000780400090

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMP 78EB 1A is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMP 78EB 1A against other structures in Honolulu and across Hawaii. Hawaii bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMP 78EB 1A?

RAMP 78EB 1A in Honolulu, Hawaii has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RAMP 78EB 1A inspected?

RAMP 78EB 1A's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 37,170 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMP 78EB 1A is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMP 78EB 1A?

RAMP 78EB 1A has an NBI inventory load rating of 20.9 metric tons.

Who is responsible for maintaining RAMP 78EB 1A?

RAMP 78EB 1A is owned and maintained by State Highway Agency.

How old is RAMP 78EB 1A and does age affect safety?

RAMP 78EB 1A was built in 1974, making it 52 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.