FHWA NBI 2024 Inspection record Public-domain dataset

AL-14

Carrying AL-14 over Coal Fire Creek Relief

4.8 MI E MISS ST LINE, Pickens, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: AL-14

The AL-14 bridge in Pickens, Alabama carries AL-14 over Coal Fire Creek Relief. It was built in 1953, making it 73 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 32.9 meters (108 feet) end to end. Daily traffic averages 1,215 vehicles, placing it in the moderately-trafficked tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AL-14 compares

▼ 13.8
Load rating vs Alabama average (38.3 t)
Bottom 21%
Lower load rating than 79% of Alabama bridges
203
Bridges in Pickens · 15 in Poor condition
AL-14 24.5 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
69.0 / 100 - historical 50–79.9 band
Structural adequacy /55
47.8
Serviceability /30
12.0
Essentiality /15
12.2
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1953
Material
Concrete
Number of Spans
3
Structure Length
32.9 m (108 ft)
Deck Width
8.9 m (29 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,215 vehicles/day
Structure Number
004576

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether AL-14 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare AL-14 against other structures in Pickens and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AL-14?

AL-14 in Pickens, Alabama has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is AL-14 inspected?

AL-14's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,215 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AL-14 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AL-14?

AL-14 has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining AL-14?

AL-14 is owned and maintained by State Highway Agency.

How old is AL-14 and does age affect safety?

AL-14 was built in 1953, making it 73 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.