FHWA NBI 2024 Inspection record Public-domain dataset

AL - 3 SOUTH

Carrying AL - 3 SOUTH over PEAVINE CK * ACL RR

@ CO RD 52, Shelby, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating

Bridge Snapshot: AL - 3 SOUTH

The AL - 3 SOUTH bridge in Shelby, Alabama carries AL - 3 SOUTH over PEAVINE CK * ACL RR. It was built in 1955, making it 71 years old today. The structure is built primarily of concrete and spans 11 sections, stretching 130.1 meters (427 feet) end to end. Daily traffic averages 13,630 vehicles, placing it in the heavily-trafficked tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 28.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AL - 3 SOUTH compares

▼ 9.8
Load rating vs Alabama average (38.3 t)
Bottom 33%
Lower load rating than 67% of Alabama bridges
293
Bridges in Shelby · 2 in Poor condition
AL - 3 SOUTH 28.5 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
63.3 / 100 - historical 50–79.9 band
Structural adequacy /55
42.5
Serviceability /30
8.0
Essentiality /15
12.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
28.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1955
Material
Concrete
Number of Spans
11
Structure Length
130.1 m (427 ft)
Deck Width
9.4 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,630 vehicles/day
Structure Number
005097

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether AL - 3 SOUTH is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare AL - 3 SOUTH against other structures in Shelby and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AL - 3 SOUTH?

AL - 3 SOUTH in Shelby, Alabama has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is AL - 3 SOUTH inspected?

AL - 3 SOUTH's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,630 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AL - 3 SOUTH is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AL - 3 SOUTH?

AL - 3 SOUTH has an NBI inventory load rating of 28.5 metric tons.

Who is responsible for maintaining AL - 3 SOUTH?

AL - 3 SOUTH is owned and maintained by State Highway Agency.

How old is AL - 3 SOUTH and does age affect safety?

AL - 3 SOUTH was built in 1955, making it 71 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.