NH 9(LOUDON ROAD)
Carrying NH 9(LOUDON ROAD) over MERRIMACK RIVER
0.1 MI EAST JCT I-93, Merrimack, New Hampshire
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: NH 9(LOUDON ROAD)
The NH 9(LOUDON ROAD) bridge in Merrimack, New Hampshire carries NH 9(LOUDON ROAD) over MERRIMACK RIVER. It was built in 1966, making it 60 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 160.0 meters (525 feet) end to end. Daily traffic averages 23,188 vehicles, placing it in the heavily-trafficked tier of New Hampshire bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 3/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 31.7 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How NH 9(LOUDON ROAD) compares
Live comparison across New Hampshire.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1966
- Last Reconstructed
- 1996
- Material
- Steel Continuous
- Number of Spans
- 4
- Structure Length
- 160.0 m (525 ft)
- Deck Width
- 23.5 m (77 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 23,188 vehicles/day
- Structure Number
- 005201630011100
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
- • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
- • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.
How to read this record
NH 9(LOUDON ROAD) is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare NH 9(LOUDON ROAD) against other structures in Merrimack and across New Hampshire. New Hampshire bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for NH 9(LOUDON ROAD)?
NH 9(LOUDON ROAD) in Merrimack, New Hampshire has a deck rating of 3/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.
How often is NH 9(LOUDON ROAD) inspected?
NH 9(LOUDON ROAD)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 23,188 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. NH 9(LOUDON ROAD) is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for NH 9(LOUDON ROAD)?
NH 9(LOUDON ROAD) has an NBI inventory load rating of 31.7 metric tons.
Who is responsible for maintaining NH 9(LOUDON ROAD)?
NH 9(LOUDON ROAD) is owned and maintained by City/Municipal Highway Agency.
How old is NH 9(LOUDON ROAD) and does age affect safety?
NH 9(LOUDON ROAD) was built in 1966, making it 60 years old and last reconstructed in 1996.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.