FHWA NBI 2024 Inspection record Public-domain dataset

OR 31 (HWY 019)

Carrying OR 31 (HWY 019) over CHEWAUCAN RIVER,PAISLEY

002 MI N PAISLEY, Lake, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: OR 31 (HWY 019)

The OR 31 (HWY 019) bridge in Lake, Oregon carries OR 31 (HWY 019) over CHEWAUCAN RIVER,PAISLEY. It was built in 1966, making it 60 years old today. The structure is built primarily of prestressed concrete and spans 5 sections, stretching 65.2 meters (214 feet) end to end. Daily traffic averages 744 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 19.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OR 31 (HWY 019) compares

▼ 13.2
Load rating vs Oregon average (32.3 t)
Bottom 17%
Lower load rating than 83% of Oregon bridges
94
Bridges in Lake · 6 in Poor condition
OR 31 (HWY 019) 19.1 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
78.4 / 100 - historical 50–79.9 band
Structural adequacy /55
39.2
Serviceability /30
29.0
Essentiality /15
13.2
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Material
Prestressed Concrete
Number of Spans
5
Structure Length
65.2 m (214 ft)
Deck Width
13.4 m (44 ft)
Owner
State Highway Agency
Avg Daily Traffic
744 vehicles/day
Structure Number
00572A019 09823

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 31 (HWY 019) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 31 (HWY 019) against other structures in Lake and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 31 (HWY 019)?

OR 31 (HWY 019) in Lake, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is OR 31 (HWY 019) inspected?

OR 31 (HWY 019)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 744 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 31 (HWY 019) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 31 (HWY 019)?

OR 31 (HWY 019) has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining OR 31 (HWY 019)?

OR 31 (HWY 019) is owned and maintained by State Highway Agency.

How old is OR 31 (HWY 019) and does age affect safety?

OR 31 (HWY 019) was built in 1966, making it 60 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.