FHWA NBI 2024 Inspection record Public-domain dataset

PR 200R

Carrying PR 200R over COFRESI CREEK

AT ISABEL II, VIEQUES, Vieques, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
8 t Inventory load rating

Bridge Snapshot: PR 200R

The PR 200R bridge in Vieques, Puerto Rico carries PR 200R over COFRESI CREEK. It was built in 1940, making it 86 years old today. It was last reconstructed in 1965, extending its service life. The structure is built primarily of steel and spans 2 sections, stretching 20.3 meters (67 feet) end to end. Daily traffic averages 10,300 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 7.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 200R compares

▼ 28.2
Load rating vs Puerto Rico average (36.1 t)
Bottom 4%
Lower load rating than 96% of Puerto Rico bridges
13
Bridges in Vieques · 2 in Poor condition
PR 200R 7.9 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
3.0 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
3.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
7.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
1965
Material
Steel
Number of Spans
2
Structure Length
20.3 m (67 ft)
Deck Width
9.2 m (30 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,300 vehicles/day
Structure Number
006311

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

PR 200R is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 200R against other structures in Vieques and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 200R?

PR 200R in Vieques, Puerto Rico has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PR 200R inspected?

PR 200R's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 200R is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 200R?

PR 200R has an NBI inventory load rating of 7.9 metric tons.

Who is responsible for maintaining PR 200R?

PR 200R is owned and maintained by State Highway Agency.

How old is PR 200R and does age affect safety?

PR 200R was built in 1940, making it 86 years old and last reconstructed in 1965.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.