FHWA NBI 2024 Inspection record Public-domain dataset

PR 2

Carrying PR 2 over ROSARIO RIVER

4 KM EAST OF HORMIGUEROS, Hormigueros, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: PR 2

The PR 2 bridge in Hormigueros, Puerto Rico carries PR 2 over ROSARIO RIVER. It was built in 1964, making it 62 years old today. The structure is built primarily of concrete continuous and spans 4 sections, stretching 78.2 meters (257 feet) end to end. Daily traffic averages 35,000 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 2/9. The weakest component sits in critical condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 19.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 2 compares

▼ 17.0
Load rating vs Puerto Rico average (36.1 t)
Bottom 23%
Lower load rating than 77% of Puerto Rico bridges
17
Bridges in Hormigueros · 2 in Poor condition
PR 2 19.1 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
20.0 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
20.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
2/9
Poor (1–4)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1964
Material
Concrete Continuous
Number of Spans
4
Structure Length
78.2 m (257 ft)
Deck Width
23.6 m (77 ft)
Owner
State Highway Agency
Avg Daily Traffic
35,000 vehicles/day
Structure Number
007901

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in critical condition (2/9), with severe deterioration requiring urgent attention.

How to read this record

PR 2 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 2 against other structures in Hormigueros and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 2?

PR 2 in Hormigueros, Puerto Rico has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 2/9 on the FHWA's 0–9 scale.

How often is PR 2 inspected?

PR 2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 2 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 2?

PR 2 has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining PR 2?

PR 2 is owned and maintained by State Highway Agency.

How old is PR 2 and does age affect safety?

PR 2 was built in 1964, making it 62 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.