FHWA NBI 2024 Inspection record Public-domain dataset

Piney Grove Road

Carrying Piney Grove Road over NO NAME BRANCH

Between CR72 and CR30, Covington, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
12 t Inventory load rating

Bridge Snapshot: Piney Grove Road

The Piney Grove Road bridge in Covington, Alabama carries Piney Grove Road over NO NAME BRANCH. It was built in 1934, making it 92 years old today. It was last reconstructed in 1966, extending its service life. The structure is built primarily of wood or timber and spans 2 sections, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 190 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 11.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Piney Grove Road compares

▼ 26.5
Load rating vs Alabama average (38.3 t)
Bottom 4%
Lower load rating than 96% of Alabama bridges
264
Bridges in Covington · 14 in Poor condition
Piney Grove Road 11.8 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
45.0 / 100 - historical 20–49.9 band
Structural adequacy /55
14.6
Serviceability /30
15.5
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
11.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1934
Last Reconstructed
1966
Material
Wood or Timber
Number of Spans
2
Structure Length
9.8 m (32 ft)
Deck Width
4.9 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
190 vehicles/day
Structure Number
008948

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether Piney Grove Road is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Piney Grove Road against other structures in Covington and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Piney Grove Road?

Piney Grove Road in Covington, Alabama has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is Piney Grove Road inspected?

Piney Grove Road's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 190 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Piney Grove Road is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Piney Grove Road?

Piney Grove Road has an NBI inventory load rating of 11.8 metric tons.

Who is responsible for maintaining Piney Grove Road?

Piney Grove Road is owned and maintained by County Highway Agency.

How old is Piney Grove Road and does age affect safety?

Piney Grove Road was built in 1934, making it 92 years old and last reconstructed in 1966.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.