FHWA NBI 2024 Inspection record Public-domain dataset

NH 11

Carrying NH 11 over POOR FARM BROOK

1.7 MI S ALTON TL, Belknap, New Hampshire

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
37 t Inventory load rating

Bridge Snapshot: NH 11

The NH 11 bridge in Belknap, New Hampshire carries NH 11 over POOR FARM BROOK. It was built in 1966, making it 60 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 5,454 vehicles, placing it in the moderately-trafficked tier of New Hampshire bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 37.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NH 11 compares

▼ 1.0
Load rating vs New Hampshire average (38.2 t)
Top 48%
Higher load rating than 52% of New Hampshire bridges
112
Bridges in Belknap · 5 in Poor condition
NH 11 37.2 t
New Hampshire average 38.2 t

Live comparison across New Hampshire.

Historical Sufficiency Rating

PlainBridge-computed
68.0 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
25.0
Essentiality /15
13.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
37.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Last Reconstructed
2000
Material
Prestressed Concrete
Number of Spans
1
Structure Length
9.1 m (30 ft)
Deck Width
17.0 m (56 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,454 vehicles/day
Structure Number
009101150014700

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

NH 11 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare NH 11 against other structures in Belknap and across New Hampshire. New Hampshire bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NH 11?

NH 11 in Belknap, New Hampshire has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is NH 11 inspected?

NH 11's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,454 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NH 11 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NH 11?

NH 11 has an NBI inventory load rating of 37.2 metric tons.

Who is responsible for maintaining NH 11?

NH 11 is owned and maintained by State Highway Agency.

How old is NH 11 and does age affect safety?

NH 11 was built in 1966, making it 60 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.