FHWA NBI 2024 Inspection record Public-domain dataset

PR 2 WESTBOUND

Carrying PR 2 WESTBOUND over GRANDE DE MANATI RIVER

4 KM WEST OF MANATI, Manatí, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: PR 2 WESTBOUND

The PR 2 WESTBOUND bridge in Manatí, Puerto Rico carries PR 2 WESTBOUND over GRANDE DE MANATI RIVER. It was built in 1968, making it 58 years old today. The structure is built primarily of prestressed concrete and spans 15 sections, stretching 308.0 meters (1011 feet) end to end. Daily traffic averages 15,150 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 2 WESTBOUND compares

▼ 3.8
Load rating vs Puerto Rico average (36.1 t)
Bottom 48%
Lower load rating than 52% of Puerto Rico bridges
15
Bridges in Manatí
PR 2 WESTBOUND 32.3 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
80.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
14.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1968
Material
Prestressed Concrete
Number of Spans
15
Structure Length
308.0 m (1011 ft)
Deck Width
11.1 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
15,150 vehicles/day
Structure Number
010492

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether PR 2 WESTBOUND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PR 2 WESTBOUND against other structures in Manatí and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 2 WESTBOUND?

PR 2 WESTBOUND in Manatí, Puerto Rico has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PR 2 WESTBOUND inspected?

PR 2 WESTBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15,150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 2 WESTBOUND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 2 WESTBOUND?

PR 2 WESTBOUND has an NBI inventory load rating of 32.3 metric tons.

Who is responsible for maintaining PR 2 WESTBOUND?

PR 2 WESTBOUND is owned and maintained by State Highway Agency.

How old is PR 2 WESTBOUND and does age affect safety?

PR 2 WESTBOUND was built in 1968, making it 58 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.