FHWA NBI 2024 Inspection record Public-domain dataset

PR 52 NORTHBOUND

Carrying PR 52 NORTHBOUND over DIRT ROAD

1.1 KM NORTHEAST INT PR 1, Ponce, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
49 t Inventory load rating

Bridge Snapshot: PR 52 NORTHBOUND

The PR 52 NORTHBOUND bridge in Ponce, Puerto Rico carries PR 52 NORTHBOUND over DIRT ROAD. It was built in 1971, making it 55 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 31.3 meters (103 feet) end to end. Daily traffic averages 32,200 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 48.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 52 NORTHBOUND compares

▲ 12.5
Load rating vs Puerto Rico average (36.1 t)
Top 24%
Higher load rating than 76% of Puerto Rico bridges
123
Bridges in Ponce · 16 in Poor condition
PR 52 NORTHBOUND 48.6 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
95.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
27.0
Essentiality /15
13.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
48.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Prestressed Concrete
Number of Spans
1
Structure Length
31.3 m (103 ft)
Deck Width
14.1 m (46 ft)
Owner
State Highway Agency
Avg Daily Traffic
32,200 vehicles/day
Structure Number
010672

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

PR 52 NORTHBOUND is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PR 52 NORTHBOUND against other structures in Ponce and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 52 NORTHBOUND?

PR 52 NORTHBOUND in Ponce, Puerto Rico has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PR 52 NORTHBOUND inspected?

PR 52 NORTHBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 32,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 52 NORTHBOUND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 52 NORTHBOUND?

PR 52 NORTHBOUND has an NBI inventory load rating of 48.6 metric tons.

Who is responsible for maintaining PR 52 NORTHBOUND?

PR 52 NORTHBOUND is owned and maintained by State Highway Agency.

How old is PR 52 NORTHBOUND and does age affect safety?

PR 52 NORTHBOUND was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.