FHWA NBI 2024 Inspection record Public-domain dataset

SPANISH CREEK ROAD

Carrying SPANISH CREEK ROAD over NORTH FORK SPANISH CREEK

SPANISH CREEK, Madison, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating

Bridge Snapshot: SPANISH CREEK ROAD

The SPANISH CREEK ROAD bridge in Madison, Montana carries SPANISH CREEK ROAD over NORTH FORK SPANISH CREEK. It was built in 1967, making it 59 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 9.9 meters (32 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 27.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SPANISH CREEK ROAD compares

▼ 3.2
Load rating vs Montana average (30.7 t)
Bottom 43%
Lower load rating than 57% of Montana bridges
84
Bridges in Madison · 11 in Poor condition
SPANISH CREEK ROAD 27.5 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
83.1 / 100 - historical 80–100 band
Structural adequacy /55
51.5
Serviceability /30
25.0
Essentiality /15
14.6
Special reductions
−7.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Wood or Timber
Number of Spans
1
Structure Length
9.9 m (32 ft)
Deck Width
7.7 m (25 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
011106000000102

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SPANISH CREEK ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SPANISH CREEK ROAD against other structures in Madison and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPANISH CREEK ROAD?

SPANISH CREEK ROAD in Madison, Montana has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SPANISH CREEK ROAD inspected?

SPANISH CREEK ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPANISH CREEK ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPANISH CREEK ROAD?

SPANISH CREEK ROAD has an NBI inventory load rating of 27.5 metric tons.

Who is responsible for maintaining SPANISH CREEK ROAD?

SPANISH CREEK ROAD is owned and maintained by U.S. Forest Service.

How old is SPANISH CREEK ROAD and does age affect safety?

SPANISH CREEK ROAD was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.