FHWA NBI 2024 Inspection record Public-domain dataset

SH 24 / 50 SB

Carrying SH 24 / 50 SB over SH 24/50 SB

7.9MI S JCT SH 24 & SH 50, Hunt, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: SH 24 / 50 SB

The SH 24 / 50 SB bridge in Hunt, Texas carries SH 24 / 50 SB over SH 24/50 SB. It was built in 1995, making it 31 years old today. The structure is built primarily of prestressed concrete. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Texas bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. All reported major components score above the Poor range.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 24 / 50 SB compares

456
Bridges in Hunt · 3 in Poor condition

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
90.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
22.0
Essentiality /15
14.7
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Prestressed Concrete
Avg Daily Traffic
50 vehicles/day
Structure Number
011170232101002

How to read this record

This page shows what the last federal inspection recorded, not whether SH 24 / 50 SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 24 / 50 SB against other structures in Hunt and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 24 / 50 SB?

SH 24 / 50 SB in Hunt, Texas on the FHWA's 0–9 scale.

How often is SH 24 / 50 SB inspected?

SH 24 / 50 SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 24 / 50 SB is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 24 / 50 SB?

An inventory load rating is not recorded for SH 24 / 50 SB.

Who is responsible for maintaining SH 24 / 50 SB?

Ownership is not specified for SH 24 / 50 SB in the NBI.

How old is SH 24 / 50 SB and does age affect safety?

SH 24 / 50 SB was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.