FHWA NBI 2024 Inspection record Public-domain dataset

US 199 (HWY 025)

Carrying US 199 (HWY 025) over DWIGHT CREEK

40.9 MI W OF GRANTS PASS, Josephine, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: US 199 (HWY 025)

The US 199 (HWY 025) bridge in Josephine, Oregon carries US 199 (HWY 025) over DWIGHT CREEK. It was built in 1924, making it 102 years old today. It was last reconstructed in 1959, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 22.9 meters (75 feet) end to end. Daily traffic averages 3,217 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 18.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US 199 (HWY 025) compares

▼ 13.8
Load rating vs Oregon average (32.3 t)
Bottom 15%
Lower load rating than 85% of Oregon bridges
226
Bridges in Josephine · 6 in Poor condition
US 199 (HWY 025) 18.5 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
49.1 / 100 - historical 20–49.9 band
Structural adequacy /55
28.1
Serviceability /30
28.0
Essentiality /15
0.0
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
18.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1924
Last Reconstructed
1959
Material
Concrete Continuous
Number of Spans
3
Structure Length
22.9 m (75 ft)
Deck Width
12.1 m (40 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,217 vehicles/day
Structure Number
01118A025 04087

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether US 199 (HWY 025) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 199 (HWY 025) against other structures in Josephine and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 199 (HWY 025)?

US 199 (HWY 025) in Josephine, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is US 199 (HWY 025) inspected?

US 199 (HWY 025)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,217 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 199 (HWY 025) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 199 (HWY 025)?

US 199 (HWY 025) has an NBI inventory load rating of 18.5 metric tons.

Who is responsible for maintaining US 199 (HWY 025)?

US 199 (HWY 025) is owned and maintained by State Highway Agency.

How old is US 199 (HWY 025) and does age affect safety?

US 199 (HWY 025) was built in 1924, making it 102 years old and last reconstructed in 1959.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.