FHWA NBI 2024 Inspection record Public-domain dataset

FDR 235

Carrying FDR 235 over BENCHMARK CR.

BENCHMARK CR., Judith Basin, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
51 t Inventory load rating

Bridge Snapshot: FDR 235

The FDR 235 bridge in Judith Basin, Montana carries FDR 235 over BENCHMARK CR.. It was built in 1993, making it 33 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 17.1 meters (56 feet) end to end. Daily traffic averages 40 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 50.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FDR 235 compares

▲ 20.2
Load rating vs Montana average (30.7 t)
Top 5%
Higher load rating than 95% of Montana bridges
48
Bridges in Judith Basin · 6 in Poor condition
FDR 235 50.9 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
70.9 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
19.3
Essentiality /15
14.6
Special reductions
−7.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
50.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1993
Material
Prestressed Concrete
Number of Spans
1
Structure Length
17.1 m (56 ft)
Deck Width
5.4 m (18 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
40 vehicles/day
Structure Number
011501000000065

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether FDR 235 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FDR 235 against other structures in Judith Basin and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FDR 235?

FDR 235 in Judith Basin, Montana has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FDR 235 inspected?

FDR 235's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FDR 235 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FDR 235?

FDR 235 has an NBI inventory load rating of 50.9 metric tons.

Who is responsible for maintaining FDR 235?

FDR 235 is owned and maintained by U.S. Forest Service.

How old is FDR 235 and does age affect safety?

FDR 235 was built in 1993, making it 33 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.