FHWA NBI 2024 Inspection record Public-domain dataset

NFSR 274

Carrying NFSR 274 over SPRING CREEK

SPRING CREEK 2, Meagher, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: NFSR 274

The NFSR 274 bridge in Meagher, Montana carries NFSR 274 over SPRING CREEK. It was built in 1996, making it 30 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 10.8 meters (35 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 29.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NFSR 274 compares

▼ 0.9
Load rating vs Montana average (30.7 t)
Top 49%
Higher load rating than 51% of Montana bridges
52
Bridges in Meagher · 5 in Poor condition
NFSR 274 29.8 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
86.9 / 100 - historical 80–100 band
Structural adequacy /55
53.6
Serviceability /30
18.5
Essentiality /15
14.8
Special reductions
−0.1

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
29.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1996
Material
Prestressed Concrete
Number of Spans
1
Structure Length
10.8 m (35 ft)
Deck Width
5.5 m (18 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
011506000000053

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether NFSR 274 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NFSR 274 against other structures in Meagher and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NFSR 274?

NFSR 274 in Meagher, Montana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is NFSR 274 inspected?

NFSR 274's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NFSR 274 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NFSR 274?

NFSR 274 has an NBI inventory load rating of 29.8 metric tons.

Who is responsible for maintaining NFSR 274?

NFSR 274 is owned and maintained by U.S. Forest Service.

How old is NFSR 274 and does age affect safety?

NFSR 274 was built in 1996, making it 30 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.