FHWA NBI 2024 Inspection record Public-domain dataset

FINLEY CR RD

Carrying FINLEY CR RD over PLACID CR

FINLEY CR, Missoula, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
31 t Inventory load rating

Bridge Snapshot: FINLEY CR RD

The FINLEY CR RD bridge in Missoula, Montana carries FINLEY CR RD over PLACID CR. It was built in 1959, making it 67 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 7.5 meters (25 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 30.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FINLEY CR RD compares

▼ 0.2
Load rating vs Montana average (30.7 t)
Top 46%
Higher load rating than 54% of Montana bridges
205
Bridges in Missoula · 15 in Poor condition
FINLEY CR RD 30.5 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
52.7 / 100 - historical 50–79.9 band
Structural adequacy /55
29.1
Serviceability /30
14.3
Essentiality /15
14.3
Special reductions
−4.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
30.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Material
Wood or Timber
Number of Spans
1
Structure Length
7.5 m (25 ft)
Deck Width
4.7 m (15 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
011606000000180

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

FINLEY CR RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FINLEY CR RD against other structures in Missoula and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FINLEY CR RD?

FINLEY CR RD in Missoula, Montana has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is FINLEY CR RD inspected?

FINLEY CR RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FINLEY CR RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FINLEY CR RD?

FINLEY CR RD has an NBI inventory load rating of 30.5 metric tons.

Who is responsible for maintaining FINLEY CR RD?

FINLEY CR RD is owned and maintained by U.S. Forest Service.

How old is FINLEY CR RD and does age affect safety?

FINLEY CR RD was built in 1959, making it 67 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.