FHWA NBI 2024 Inspection record Public-domain dataset

NFSR 223

Carrying NFSR 223 over GLOVER CREEK

15 MILES FROM LOWELL, Idaho, Idaho

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
40 t Inventory load rating

Bridge Snapshot: NFSR 223

The NFSR 223 bridge in Idaho, Idaho carries NFSR 223 over GLOVER CREEK. It was built in 2014, making it 12 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.7 meters (38 feet) end to end. Daily traffic averages 40 vehicles, placing it in the lower-traffic tier of Idaho bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 39.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NFSR 223 compares

▲ 8.6
Load rating vs Idaho average (31.3 t)
Top 19%
Higher load rating than 81% of Idaho bridges
130
Bridges in Idaho · 10 in Poor condition
NFSR 223 39.9 t
Idaho average 31.3 t

Live comparison across Idaho.

Historical Sufficiency Rating

PlainBridge-computed
93.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.1
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2014
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.7 m (38 ft)
Deck Width
8.0 m (26 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
40 vehicles/day
Structure Number
011706000019897

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether NFSR 223 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NFSR 223 against other structures in Idaho and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NFSR 223?

NFSR 223 in Idaho, Idaho has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is NFSR 223 inspected?

NFSR 223's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NFSR 223 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NFSR 223?

NFSR 223 has an NBI inventory load rating of 39.9 metric tons.

Who is responsible for maintaining NFSR 223?

NFSR 223 is owned and maintained by U.S. Forest Service.

How old is NFSR 223 and does age affect safety?

NFSR 223 was built in 2014, making it 12 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.