FHWA NBI 2024 Inspection record Public-domain dataset

FOREST ROAD 1858

Carrying FOREST ROAD 1858 over NEWSOME CREEK

NEWSOME TOWN SITE, Idaho, Idaho

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
40 t Inventory load rating

Bridge Snapshot: FOREST ROAD 1858

The FOREST ROAD 1858 bridge in Idaho, Idaho carries FOREST ROAD 1858 over NEWSOME CREEK. It was built in 1966, making it 60 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of wood or timber and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 40 vehicles, placing it in the lower-traffic tier of Idaho bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 40.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FOREST ROAD 1858 compares

▲ 8.9
Load rating vs Idaho average (31.3 t)
Top 18%
Higher load rating than 82% of Idaho bridges
130
Bridges in Idaho · 10 in Poor condition
FOREST ROAD 1858 40.2 t
Idaho average 31.3 t

Live comparison across Idaho.

Historical Sufficiency Rating

PlainBridge-computed
95.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Last Reconstructed
1991
Material
Wood or Timber
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
7.7 m (25 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
40 vehicles/day
Structure Number
011708000000017

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FOREST ROAD 1858 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FOREST ROAD 1858 against other structures in Idaho and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FOREST ROAD 1858?

FOREST ROAD 1858 in Idaho, Idaho has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FOREST ROAD 1858 inspected?

FOREST ROAD 1858's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FOREST ROAD 1858 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FOREST ROAD 1858?

FOREST ROAD 1858 has an NBI inventory load rating of 40.2 metric tons.

Who is responsible for maintaining FOREST ROAD 1858?

FOREST ROAD 1858 is owned and maintained by U.S. Forest Service.

How old is FOREST ROAD 1858 and does age affect safety?

FOREST ROAD 1858 was built in 1966, making it 60 years old and last reconstructed in 1991.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.