FHWA NBI 2024 Inspection record Public-domain dataset

New Harmony Road

Carrying New Harmony Road over JAKE CREEK

SEC.8,T20N,R17E, Elmore, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: New Harmony Road

The New Harmony Road bridge in Elmore, Alabama carries New Harmony Road over JAKE CREEK. It was built in 1981, making it 45 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 17.4 meters (57 feet) end to end. Daily traffic averages 40 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 33.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How New Harmony Road compares

▼ 5.0
Load rating vs Alabama average (38.3 t)
Bottom 49%
Lower load rating than 51% of Alabama bridges
169
Bridges in Elmore · 4 in Poor condition
New Harmony Road 33.3 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
97.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
33.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Concrete
Number of Spans
3
Structure Length
17.4 m (57 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
40 vehicles/day
Structure Number
012514

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether New Harmony Road is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare New Harmony Road against other structures in Elmore and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for New Harmony Road?

New Harmony Road in Elmore, Alabama has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is New Harmony Road inspected?

New Harmony Road's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. New Harmony Road is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for New Harmony Road?

New Harmony Road has an NBI inventory load rating of 33.3 metric tons.

Who is responsible for maintaining New Harmony Road?

New Harmony Road is owned and maintained by County Highway Agency.

How old is New Harmony Road and does age affect safety?

New Harmony Road was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.