FHWA NBI 2024 Inspection record Public-domain dataset

AL-233

Carrying AL-233 over Little New River

0.8 MI S JCT US 78, Marion, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: AL-233

The AL-233 bridge in Marion, Alabama carries AL-233 over Little New River. It was built in 1985, making it 41 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 68.3 meters (224 feet) end to end. Daily traffic averages 576 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 31.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AL-233 compares

▼ 6.8
Load rating vs Alabama average (38.3 t)
Bottom 42%
Lower load rating than 58% of Alabama bridges
207
Bridges in Marion · 1 in Poor condition
AL-233 31.5 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
97.7 / 100 - historical 80–100 band
Structural adequacy /55
54.7
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
31.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Prestressed Concrete
Number of Spans
1
Structure Length
68.3 m (224 ft)
Deck Width
11.2 m (37 ft)
Owner
State Highway Agency
Avg Daily Traffic
576 vehicles/day
Structure Number
013704

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether AL-233 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare AL-233 against other structures in Marion and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AL-233?

AL-233 in Marion, Alabama has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is AL-233 inspected?

AL-233's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 576 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AL-233 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AL-233?

AL-233 has an NBI inventory load rating of 31.5 metric tons.

Who is responsible for maintaining AL-233?

AL-233 is owned and maintained by State Highway Agency.

How old is AL-233 and does age affect safety?

AL-233 was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.