FHWA NBI 2024 Inspection record Public-domain dataset

PELLAM BLVD.

Carrying PELLAM BLVD. over AUBURN WATERWAY

1.1 MI N OF EDGEWATER, Charlotte, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
44 t Inventory load rating

Bridge Snapshot: PELLAM BLVD.

The PELLAM BLVD. bridge in Charlotte, Florida carries PELLAM BLVD. over AUBURN WATERWAY. It was built in 1964, making it 62 years old today. It was last reconstructed in 2003, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 31.0 meters (102 feet) end to end. Daily traffic averages 2,500 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 43.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PELLAM BLVD. compares

▲ 4.6
Load rating vs Florida average (38.9 t)
Top 28%
Higher load rating than 72% of Florida bridges
177
Bridges in Charlotte
PELLAM BLVD. 43.5 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
80.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
12.9
Essentiality /15
14.3
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
43.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1964
Last Reconstructed
2003
Material
Prestressed Concrete
Number of Spans
3
Structure Length
31.0 m (102 ft)
Deck Width
10.1 m (33 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,500 vehicles/day
Structure Number
014030

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PELLAM BLVD. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PELLAM BLVD. against other structures in Charlotte and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PELLAM BLVD.?

PELLAM BLVD. in Charlotte, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PELLAM BLVD. inspected?

PELLAM BLVD.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PELLAM BLVD. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PELLAM BLVD.?

PELLAM BLVD. has an NBI inventory load rating of 43.5 metric tons.

Who is responsible for maintaining PELLAM BLVD.?

PELLAM BLVD. is owned and maintained by County Highway Agency.

How old is PELLAM BLVD. and does age affect safety?

PELLAM BLVD. was built in 1964, making it 62 years old and last reconstructed in 2003.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.