FHWA NBI 2024 Inspection record Public-domain dataset

AL 69

Carrying AL 69 over LITTLE PRAIRIE CREEK

0.7 MI S CASEMORE, Hale, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating

Bridge Snapshot: AL 69

The AL 69 bridge in Hale, Alabama carries AL 69 over LITTLE PRAIRIE CREEK. It was built in 1988, making it 38 years old today. The structure is built primarily of prestressed concrete continuous and spans 7 sections, stretching 87.5 meters (287 feet) end to end. Daily traffic averages 2,330 vehicles, placing it in the moderately-trafficked tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 30.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AL 69 compares

▼ 8.0
Load rating vs Alabama average (38.3 t)
Bottom 38%
Lower load rating than 62% of Alabama bridges
137
Bridges in Hale · 6 in Poor condition
AL 69 30.3 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
96.5 / 100 - historical 80–100 band
Structural adequacy /55
54.0
Serviceability /30
30.0
Essentiality /15
12.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
30.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Prestressed Concrete Continuous
Number of Spans
7
Structure Length
87.5 m (287 ft)
Deck Width
13.0 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,330 vehicles/day
Structure Number
014611

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether AL 69 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare AL 69 against other structures in Hale and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AL 69?

AL 69 in Hale, Alabama has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is AL 69 inspected?

AL 69's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,330 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AL 69 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AL 69?

AL 69 has an NBI inventory load rating of 30.3 metric tons.

Who is responsible for maintaining AL 69?

AL 69 is owned and maintained by State Highway Agency.

How old is AL 69 and does age affect safety?

AL 69 was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.