FHWA NBI 2024 Inspection record Public-domain dataset

R25E (R6E-R9E)

Carrying R25E (R6E-R9E) over ABANDONED R.R. TRACK

2.0 MI E JCT I565 * SR 53, Madison, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
27 t Inventory load rating

Bridge Snapshot: R25E (R6E-R9E)

The R25E (R6E-R9E) bridge in Madison, Alabama carries R25E (R6E-R9E) over ABANDONED R.R. TRACK. It was built in 1991, making it 35 years old today. The structure is built primarily of prestressed concrete continuous and spans 5 sections, stretching 173.4 meters (569 feet) end to end. Daily traffic averages 10,710 vehicles, placing it in the heavily-trafficked tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 27.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How R25E (R6E-R9E) compares

▼ 11.2
Load rating vs Alabama average (38.3 t)
Bottom 30%
Lower load rating than 70% of Alabama bridges
586
Bridges in Madison · 9 in Poor condition
R25E (R6E-R9E) 27.1 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
93.0 / 100 - historical 80–100 band
Structural adequacy /55
51.0
Serviceability /30
30.0
Essentiality /15
11.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Prestressed Concrete Continuous
Number of Spans
5
Structure Length
173.4 m (569 ft)
Deck Width
8.5 m (28 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,710 vehicles/day
Structure Number
015949

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether R25E (R6E-R9E) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare R25E (R6E-R9E) against other structures in Madison and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for R25E (R6E-R9E)?

R25E (R6E-R9E) in Madison, Alabama has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is R25E (R6E-R9E) inspected?

R25E (R6E-R9E)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,710 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. R25E (R6E-R9E) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for R25E (R6E-R9E)?

R25E (R6E-R9E) has an NBI inventory load rating of 27.1 metric tons.

Who is responsible for maintaining R25E (R6E-R9E)?

R25E (R6E-R9E) is owned and maintained by State Highway Agency.

How old is R25E (R6E-R9E) and does age affect safety?

R25E (R6E-R9E) was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.