FHWA NBI 2024 Inspection record Public-domain dataset

IL 1 (HALSTED ST

Carrying IL 1 (HALSTED ST over RR- CSXT

1.5 M N IL 83, Cook, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: IL 1 (HALSTED ST

The IL 1 (HALSTED ST bridge in Cook, Illinois carries IL 1 (HALSTED ST over RR- CSXT. It was built in 1935, making it 91 years old today. It was last reconstructed in 1979, extending its service life. The structure is built primarily of steel continuous and spans 9 sections, stretching 171.0 meters (561 feet) end to end. Daily traffic averages 13,700 vehicles, placing it in the heavily-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 3/9, substructure at 3/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 42.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IL 1 (HALSTED ST compares

▲ 7.8
Load rating vs Illinois average (34.6 t)
Top 15%
Higher load rating than 85% of Illinois bridges
2,185
Bridges in Cook · 144 in Poor condition
IL 1 (HALSTED ST 42.4 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
26.1 / 100 - historical 20–49.9 band
Structural adequacy /55
15.0
Serviceability /30
8.0
Essentiality /15
3.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
3/9
Poor (1–4)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
42.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1935
Last Reconstructed
1979
Material
Steel Continuous
Number of Spans
9
Structure Length
171.0 m (561 ft)
Deck Width
20.7 m (68 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,700 vehicles/day
Structure Number
016019400000000

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) rates poor at 3/9, advanced deterioration that should be prioritized for repair.

How to read this record

IL 1 (HALSTED ST is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare IL 1 (HALSTED ST against other structures in Cook and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IL 1 (HALSTED ST?

IL 1 (HALSTED ST in Cook, Illinois has a deck rating of 5/9, superstructure rating of 3/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is IL 1 (HALSTED ST inspected?

IL 1 (HALSTED ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IL 1 (HALSTED ST is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IL 1 (HALSTED ST?

IL 1 (HALSTED ST has an NBI inventory load rating of 42.4 metric tons.

Who is responsible for maintaining IL 1 (HALSTED ST?

IL 1 (HALSTED ST is owned and maintained by State Highway Agency.

How old is IL 1 (HALSTED ST and does age affect safety?

IL 1 (HALSTED ST was built in 1935, making it 91 years old and last reconstructed in 1979.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.