FHWA NBI 2024 Inspection record Public-domain dataset

US 730 (HWY 2)

Carrying US 730 (HWY 2) over UPRR

CITY OF UMATILLA, Umatilla, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: US 730 (HWY 2)

The US 730 (HWY 2) bridge in Umatilla, Oregon carries US 730 (HWY 2) over UPRR. It was built in 1933, making it 93 years old today. It was last reconstructed in 1993, extending its service life. The structure is built primarily of concrete continuous and spans 4 sections, stretching 56.4 meters (185 feet) end to end. Daily traffic averages 9,378 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US 730 (HWY 2) compares

▼ 7.8
Load rating vs Oregon average (32.3 t)
Bottom 34%
Lower load rating than 66% of Oregon bridges
323
Bridges in Umatilla · 13 in Poor condition
US 730 (HWY 2) 24.5 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
83.8 / 100 - historical 80–100 band
Structural adequacy /55
47.8
Serviceability /30
28.0
Essentiality /15
11.1
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1933
Last Reconstructed
1993
Material
Concrete Continuous
Number of Spans
4
Structure Length
56.4 m (185 ft)
Deck Width
20.3 m (67 ft)
Owner
State Highway Agency
Avg Daily Traffic
9,378 vehicles/day
Structure Number
01628 002 18370

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether US 730 (HWY 2) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 730 (HWY 2) against other structures in Umatilla and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 730 (HWY 2)?

US 730 (HWY 2) in Umatilla, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is US 730 (HWY 2) inspected?

US 730 (HWY 2)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,378 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 730 (HWY 2) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 730 (HWY 2)?

US 730 (HWY 2) has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining US 730 (HWY 2)?

US 730 (HWY 2) is owned and maintained by State Highway Agency.

How old is US 730 (HWY 2) and does age affect safety?

US 730 (HWY 2) was built in 1933, making it 93 years old and last reconstructed in 1993.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.