FHWA NBI 2024 Inspection record Public-domain dataset

MINOR PARKWAY SB

Carrying MINOR PARKWAY SB over VILLAGE CREEK

1.0 MI S DOCENA, Jefferson, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating

Bridge Snapshot: MINOR PARKWAY SB

The MINOR PARKWAY SB bridge in Jefferson, Alabama carries MINOR PARKWAY SB over VILLAGE CREEK. It was built in 1995, making it 31 years old today. The structure is built primarily of prestressed concrete continuous and spans 5 sections, stretching 135.6 meters (445 feet) end to end. Daily traffic averages 8,315 vehicles, placing it in the moderately-trafficked tier of Alabama bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 38.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MINOR PARKWAY SB compares

▲ 0.6
Load rating vs Alabama average (38.3 t)
Top 38%
Higher load rating than 62% of Alabama bridges
885
Bridges in Jefferson · 19 in Poor condition
MINOR PARKWAY SB 38.9 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
93.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
8.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
38.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Prestressed Concrete Continuous
Number of Spans
5
Structure Length
135.6 m (445 ft)
Deck Width
12.9 m (42 ft)
Owner
County Highway Agency
Avg Daily Traffic
8,315 vehicles/day
Structure Number
016363

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether MINOR PARKWAY SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MINOR PARKWAY SB against other structures in Jefferson and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MINOR PARKWAY SB?

MINOR PARKWAY SB in Jefferson, Alabama has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is MINOR PARKWAY SB inspected?

MINOR PARKWAY SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 8,315 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MINOR PARKWAY SB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MINOR PARKWAY SB?

MINOR PARKWAY SB has an NBI inventory load rating of 38.9 metric tons.

Who is responsible for maintaining MINOR PARKWAY SB?

MINOR PARKWAY SB is owned and maintained by County Highway Agency.

How old is MINOR PARKWAY SB and does age affect safety?

MINOR PARKWAY SB was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.