FHWA NBI 2024 Inspection record Public-domain dataset

SR 46 EBL

Carrying SR 46 EBL over JACKS DEFEAT CREEK

04.83 W SR 37, Monroe, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
62 t Inventory load rating

Bridge Snapshot: SR 46 EBL

The SR 46 EBL bridge in Monroe, Indiana carries SR 46 EBL over JACKS DEFEAT CREEK. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 36.0 meters (118 feet) end to end. Daily traffic averages 6,438 vehicles, placing it in the moderately-trafficked tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 61.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 46 EBL compares

▲ 26.0
Load rating vs Indiana average (35.6 t)
Top 4%
Higher load rating than 96% of Indiana bridges
226
Bridges in Monroe · 5 in Poor condition
SR 46 EBL 61.6 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
79.8 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
61.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Concrete Continuous
Number of Spans
3
Structure Length
36.0 m (118 ft)
Deck Width
17.4 m (57 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,438 vehicles/day
Structure Number
017130

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 46 EBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 46 EBL against other structures in Monroe and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 46 EBL?

SR 46 EBL in Monroe, Indiana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 46 EBL inspected?

SR 46 EBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,438 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 46 EBL is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 46 EBL?

SR 46 EBL has an NBI inventory load rating of 61.6 metric tons.

Who is responsible for maintaining SR 46 EBL?

SR 46 EBL is owned and maintained by State Highway Agency.

How old is SR 46 EBL and does age affect safety?

SR 46 EBL was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.