ALA. RIVER PARKWAY
Carrying ALA. RIVER PARKWAY over CREEK
1.7 MI.E.OF ALA. RIVER, Montgomery, Alabama
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: ALA. RIVER PARKWAY
The ALA. RIVER PARKWAY bridge in Montgomery, Alabama carries ALA. RIVER PARKWAY over CREEK. It was built in 1997, making it 29 years old today. The structure is built primarily of concrete and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 5,000 vehicles, placing it in the moderately-trafficked tier of Alabama bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 30.3 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How ALA. RIVER PARKWAY compares
Live comparison across Alabama.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1997
- Material
- Concrete
- Number of Spans
- 1
- Structure Length
- 10.4 m (34 ft)
- Deck Width
- 18.9 m (62 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 5,000 vehicles/day
- Structure Number
- 017189
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
- • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
- • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.
How to read this record
This page shows what the last federal inspection recorded, not whether ALA. RIVER PARKWAY is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare ALA. RIVER PARKWAY against other structures in Montgomery and across Alabama. Alabama bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for ALA. RIVER PARKWAY?
ALA. RIVER PARKWAY in Montgomery, Alabama has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is ALA. RIVER PARKWAY inspected?
ALA. RIVER PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,000 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. ALA. RIVER PARKWAY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for ALA. RIVER PARKWAY?
ALA. RIVER PARKWAY has an NBI inventory load rating of 30.3 metric tons.
Who is responsible for maintaining ALA. RIVER PARKWAY?
ALA. RIVER PARKWAY is owned and maintained by County Highway Agency.
How old is ALA. RIVER PARKWAY and does age affect safety?
ALA. RIVER PARKWAY was built in 1997, making it 29 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.