FHWA NBI 2024 Inspection record Public-domain dataset

Hwy 120

Carrying Hwy 120 over Columbia Slough

5.5 MI NW PORTLAND CC, Multnomah, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: Hwy 120

The Hwy 120 bridge in Multnomah, Oregon carries Hwy 120 over Columbia Slough. It was built in 1933, making it 93 years old today. The structure is built primarily of steel and spans 1 section, stretching 103.0 meters (338 feet) end to end. Daily traffic averages 12,185 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 13.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Hwy 120 compares

▼ 18.7
Load rating vs Oregon average (32.3 t)
Bottom 6%
Lower load rating than 94% of Oregon bridges
474
Bridges in Multnomah · 12 in Poor condition
Hwy 120 13.6 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
25.5 / 100 - historical 20–49.9 band
Structural adequacy /55
18.5
Serviceability /30
7.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1933
Material
Steel
Number of Spans
1
Structure Length
103.0 m (338 ft)
Deck Width
10.3 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
12,185 vehicles/day
Structure Number
01726 120 00038

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether Hwy 120 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Hwy 120 against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Hwy 120?

Hwy 120 in Multnomah, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is Hwy 120 inspected?

Hwy 120's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,185 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Hwy 120 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Hwy 120?

Hwy 120 has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining Hwy 120?

Hwy 120 is owned and maintained by State Highway Agency.

How old is Hwy 120 and does age affect safety?

Hwy 120 was built in 1933, making it 93 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.