FHWA NBI 2024 Inspection record Public-domain dataset

SR 49 SB

Carrying SR 49 SB over CSX RR, LITTLE CALUMET R

00.37 S I-94, Porter, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: SR 49 SB

The SR 49 SB bridge in Porter, Indiana carries SR 49 SB over CSX RR, LITTLE CALUMET R. It was built in 1970, making it 56 years old today. It was last reconstructed in 2020, extending its service life. The structure is built primarily of steel continuous and spans 7 sections, stretching 127.5 meters (418 feet) end to end. Daily traffic averages 12,304 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 42.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 49 SB compares

▲ 7.2
Load rating vs Indiana average (35.6 t)
Top 18%
Higher load rating than 82% of Indiana bridges
280
Bridges in Porter · 14 in Poor condition
SR 49 SB 42.8 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
97.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Last Reconstructed
2020
Material
Steel Continuous
Number of Spans
7
Structure Length
127.5 m (418 ft)
Deck Width
11.7 m (38 ft)
Owner
State Highway Agency
Avg Daily Traffic
12,304 vehicles/day
Structure Number
018085

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 49 SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 49 SB against other structures in Porter and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 49 SB?

SR 49 SB in Porter, Indiana has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 49 SB inspected?

SR 49 SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,304 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 49 SB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 49 SB?

SR 49 SB has an NBI inventory load rating of 42.8 metric tons.

Who is responsible for maintaining SR 49 SB?

SR 49 SB is owned and maintained by State Highway Agency.

How old is SR 49 SB and does age affect safety?

SR 49 SB was built in 1970, making it 56 years old and last reconstructed in 2020.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.