FHWA NBI 2024 Inspection record Public-domain dataset

RAMP PR30 TO PR198

Carrying RAMP PR30 TO PR198 over HUMACAO RIVER

1 KM NORTHWEST OF HUMACAO, Humacao, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
48 t Inventory load rating

Bridge Snapshot: RAMP PR30 TO PR198

The RAMP PR30 TO PR198 bridge in Humacao, Puerto Rico carries RAMP PR30 TO PR198 over HUMACAO RIVER. It was built in 1985, making it 41 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 89.8 meters (295 feet) end to end. Daily traffic averages 10,882 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 48.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RAMP PR30 TO PR198 compares

▲ 12.2
Load rating vs Puerto Rico average (36.1 t)
Top 24%
Higher load rating than 76% of Puerto Rico bridges
69
Bridges in Humacao · 3 in Poor condition
RAMP PR30 TO PR198 48.3 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
69.2 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
10.0
Essentiality /15
14.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
48.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Prestressed Concrete
Number of Spans
3
Structure Length
89.8 m (295 ft)
Deck Width
8.2 m (27 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,882 vehicles/day
Structure Number
018261

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMP PR30 TO PR198 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMP PR30 TO PR198 against other structures in Humacao and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMP PR30 TO PR198?

RAMP PR30 TO PR198 in Humacao, Puerto Rico has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is RAMP PR30 TO PR198 inspected?

RAMP PR30 TO PR198's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,882 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMP PR30 TO PR198 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMP PR30 TO PR198?

RAMP PR30 TO PR198 has an NBI inventory load rating of 48.3 metric tons.

Who is responsible for maintaining RAMP PR30 TO PR198?

RAMP PR30 TO PR198 is owned and maintained by State Highway Agency.

How old is RAMP PR30 TO PR198 and does age affect safety?

RAMP PR30 TO PR198 was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.