FHWA NBI 2024 Inspection record Public-domain dataset

PROSPECT AVE

Carrying PROSPECT AVE over HIRSCHFELD BROOK

1000 ft N of Main Street, Bergen, New Jersey

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
56 t Inventory load rating

Bridge Snapshot: PROSPECT AVE

The PROSPECT AVE bridge in Bergen, New Jersey carries PROSPECT AVE over HIRSCHFELD BROOK. It was built in 1997, making it 29 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.0 meters (36 feet) end to end. Daily traffic averages 2,560 vehicles, placing it in the moderately-trafficked tier of New Jersey bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 56.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PROSPECT AVE compares

▲ 12.4
Load rating vs New Jersey average (43.8 t)
Top 23%
Higher load rating than 77% of New Jersey bridges
577
Bridges in Bergen · 13 in Poor condition
PROSPECT AVE 56.2 t
New Jersey average 43.8 t

Live comparison across New Jersey.

Historical Sufficiency Rating

PlainBridge-computed
93.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
23.6
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
56.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.0 m (36 ft)
Deck Width
14.7 m (48 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,560 vehicles/day
Structure Number
020038L

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PROSPECT AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PROSPECT AVE against other structures in Bergen and across New Jersey. New Jersey bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PROSPECT AVE?

PROSPECT AVE in Bergen, New Jersey has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PROSPECT AVE inspected?

PROSPECT AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,560 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PROSPECT AVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PROSPECT AVE?

PROSPECT AVE has an NBI inventory load rating of 56.2 metric tons.

Who is responsible for maintaining PROSPECT AVE?

PROSPECT AVE is owned and maintained by County Highway Agency.

How old is PROSPECT AVE and does age affect safety?

PROSPECT AVE was built in 1997, making it 29 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.