FHWA NBI 2024 Inspection record Public-domain dataset

CHAPEL LANE

Carrying CHAPEL LANE over PATTON CREEK

0.4 MILES FROM GALLERIA, Jefferson, Alabama

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
28 t Inventory load rating

Bridge Snapshot: CHAPEL LANE

The CHAPEL LANE bridge in Jefferson, Alabama carries CHAPEL LANE over PATTON CREEK. It was built in 2013, making it 13 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 362.7 meters (1190 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 28.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHAPEL LANE compares

▼ 10.2
Load rating vs Alabama average (38.3 t)
Bottom 32%
Lower load rating than 68% of Alabama bridges
885
Bridges in Jefferson · 19 in Poor condition
CHAPEL LANE 28.1 t
Alabama average 38.3 t

Live comparison across Alabama.

Historical Sufficiency Rating

PlainBridge-computed
91.0 / 100 - historical 80–100 band
Structural adequacy /55
52.1
Serviceability /30
24.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
28.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Steel Continuous
Number of Spans
3
Structure Length
362.7 m (1190 ft)
Deck Width
16.3 m (53 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
020814

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CHAPEL LANE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHAPEL LANE against other structures in Jefferson and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHAPEL LANE?

CHAPEL LANE in Jefferson, Alabama has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CHAPEL LANE inspected?

CHAPEL LANE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHAPEL LANE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHAPEL LANE?

CHAPEL LANE has an NBI inventory load rating of 28.1 metric tons.

Who is responsible for maintaining CHAPEL LANE?

CHAPEL LANE is owned and maintained by City/Municipal Highway Agency.

How old is CHAPEL LANE and does age affect safety?

CHAPEL LANE was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.