FHWA NBI 2024 Inspection record Public-domain dataset

FSR 523

Carrying FSR 523 over RED MOUNTAIN CREEK

10.2 MI SSW OF CREEDE, Mineral, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
37 t Inventory load rating

Bridge Snapshot: FSR 523

The FSR 523 bridge in Mineral, Colorado carries FSR 523 over RED MOUNTAIN CREEK. It was built in 1981, making it 45 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 16.8 meters (55 feet) end to end. Daily traffic averages 78 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 36.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FSR 523 compares

▼ 0.5
Load rating vs Colorado average (37.1 t)
Top 35%
Higher load rating than 65% of Colorado bridges
26
Bridges in Mineral
FSR 523 36.6 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
91.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.4
Special reductions
−6.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Last Reconstructed
1992
Material
Prestressed Concrete
Number of Spans
1
Structure Length
16.8 m (55 ft)
Deck Width
7.3 m (24 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
78 vehicles/day
Structure Number
020901000001032

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether FSR 523 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FSR 523 against other structures in Mineral and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FSR 523?

FSR 523 in Mineral, Colorado has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FSR 523 inspected?

FSR 523's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 78 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FSR 523 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FSR 523?

FSR 523 has an NBI inventory load rating of 36.6 metric tons.

Who is responsible for maintaining FSR 523?

FSR 523 is owned and maintained by U.S. Forest Service.

How old is FSR 523 and does age affect safety?

FSR 523 was built in 1981, making it 45 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.