FHWA NBI 2024 Inspection record Public-domain dataset

TUCKER RD. - PCT 2

Carrying TUCKER RD. - PCT 2 over E FORK KEECHI CREEK

1.8 MI S&W OF FM-2210, Jack, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
20 t Inventory load rating

Bridge Snapshot: TUCKER RD. - PCT 2

The TUCKER RD. - PCT 2 bridge in Jack, Texas carries TUCKER RD. - PCT 2 over E FORK KEECHI CREEK. It was built in 1946, making it 80 years old today. The structure is built primarily of steel continuous and spans 1 section, stretching 15.9 meters (52 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 20.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TUCKER RD. - PCT 2 compares

▼ 8.3
Load rating vs Texas average (28.3 t)
Bottom 2%
Lower load rating than 98% of Texas bridges
135
Bridges in Jack · 1 in Poor condition
TUCKER RD. - PCT 2 20.0 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
69.3 / 100 - historical 50–79.9 band
Structural adequacy /55
40.8
Serviceability /30
16.5
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
20.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1946
Material
Steel Continuous
Number of Spans
1
Structure Length
15.9 m (52 ft)
Deck Width
4.5 m (15 ft)
Owner
County Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
021200AA0284001

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether TUCKER RD. - PCT 2 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TUCKER RD. - PCT 2 against other structures in Jack and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TUCKER RD. - PCT 2?

TUCKER RD. - PCT 2 in Jack, Texas has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is TUCKER RD. - PCT 2 inspected?

TUCKER RD. - PCT 2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TUCKER RD. - PCT 2 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TUCKER RD. - PCT 2?

TUCKER RD. - PCT 2 has an NBI inventory load rating of 20.0 metric tons.

Who is responsible for maintaining TUCKER RD. - PCT 2?

TUCKER RD. - PCT 2 is owned and maintained by County Highway Agency.

How old is TUCKER RD. - PCT 2 and does age affect safety?

TUCKER RD. - PCT 2 was built in 1946, making it 80 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.