FHWA NBI 2024 Inspection record Public-domain dataset

ALPIERRE STREET

Carrying ALPIERRE STREET over GUAYNABO RIVER

GUAYNABO TOWN, Guaynabo, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
11 t Inventory load rating

Bridge Snapshot: ALPIERRE STREET

The ALPIERRE STREET bridge in Guaynabo, Puerto Rico carries ALPIERRE STREET over GUAYNABO RIVER. It was built in 1950, making it 76 years old today. The structure is built primarily of steel and spans 3 sections, stretching 45.0 meters (148 feet) end to end. Daily traffic averages 2,000 vehicles, placing it in the moderately-trafficked tier of Puerto Rico bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 10.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ALPIERRE STREET compares

▼ 25.3
Load rating vs Puerto Rico average (36.1 t)
Bottom 8%
Lower load rating than 92% of Puerto Rico bridges
63
Bridges in Guaynabo · 3 in Poor condition
ALPIERRE STREET 10.8 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
39.1 / 100 - historical 20–49.9 band
Structural adequacy /55
12.3
Serviceability /30
12.4
Essentiality /15
14.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
10.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Material
Steel
Number of Spans
3
Structure Length
45.0 m (148 ft)
Deck Width
11.1 m (36 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
2,000 vehicles/day
Structure Number
021641

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether ALPIERRE STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ALPIERRE STREET against other structures in Guaynabo and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ALPIERRE STREET?

ALPIERRE STREET in Guaynabo, Puerto Rico has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ALPIERRE STREET inspected?

ALPIERRE STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ALPIERRE STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ALPIERRE STREET?

ALPIERRE STREET has an NBI inventory load rating of 10.8 metric tons.

Who is responsible for maintaining ALPIERRE STREET?

ALPIERRE STREET is owned and maintained by City/Municipal Highway Agency.

How old is ALPIERRE STREET and does age affect safety?

ALPIERRE STREET was built in 1950, making it 76 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.