FHWA NBI 2024 Inspection record Public-domain dataset

SANTA ELENA STREET

Carrying SANTA ELENA STREET over CREEK

6 ST. SANTA ELENA YABUCOA, Yabucoa, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
18 t Inventory load rating

Bridge Snapshot: SANTA ELENA STREET

The SANTA ELENA STREET bridge in Yabucoa, Puerto Rico carries SANTA ELENA STREET over CREEK. It was built in 1960, making it 66 years old today. The structure is built primarily of steel and spans 1 section, stretching 9.9 meters (32 feet) end to end. Daily traffic averages 750 vehicles, placing it in the lower-traffic tier of Puerto Rico bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 18.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SANTA ELENA STREET compares

▼ 17.9
Load rating vs Puerto Rico average (36.1 t)
Bottom 21%
Lower load rating than 79% of Puerto Rico bridges
41
Bridges in Yabucoa · 9 in Poor condition
SANTA ELENA STREET 18.2 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
42.5 / 100 - historical 20–49.9 band
Structural adequacy /55
12.6
Serviceability /30
15.1
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
18.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Material
Steel
Number of Spans
1
Structure Length
9.9 m (32 ft)
Deck Width
13.4 m (44 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
750 vehicles/day
Structure Number
021781

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

SANTA ELENA STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SANTA ELENA STREET against other structures in Yabucoa and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SANTA ELENA STREET?

SANTA ELENA STREET in Yabucoa, Puerto Rico has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SANTA ELENA STREET inspected?

SANTA ELENA STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 750 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SANTA ELENA STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SANTA ELENA STREET?

SANTA ELENA STREET has an NBI inventory load rating of 18.2 metric tons.

Who is responsible for maintaining SANTA ELENA STREET?

SANTA ELENA STREET is owned and maintained by City/Municipal Highway Agency.

How old is SANTA ELENA STREET and does age affect safety?

SANTA ELENA STREET was built in 1960, making it 66 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.