Silver Lakes PCT 2
Carrying Silver Lakes PCT 2 over Cowskin Creek
1.1 Mi S of Montague C/L, Wise, Texas
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: Silver Lakes PCT 2
The Silver Lakes PCT 2 bridge in Wise, Texas carries Silver Lakes PCT 2 over Cowskin Creek. It was built in 2003, making it 23 years old today. The structure is built primarily of steel and spans 10 sections, stretching 39.3 meters (129 feet) end to end. Daily traffic averages 140 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 40.8 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How Silver Lakes PCT 2 compares
Live comparison across Texas.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2003
- Material
- Steel
- Number of Spans
- 10
- Structure Length
- 39.3 m (129 ft)
- Deck Width
- 24.4 m (80 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 140 vehicles/day
- Structure Number
- 022490AA0104001
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether Silver Lakes PCT 2 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare Silver Lakes PCT 2 against other structures in Wise and across Texas. Texas bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for Silver Lakes PCT 2?
Silver Lakes PCT 2 in Wise, Texas on the FHWA's 0–9 scale.
How often is Silver Lakes PCT 2 inspected?
Silver Lakes PCT 2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 140 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. Silver Lakes PCT 2 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for Silver Lakes PCT 2?
Silver Lakes PCT 2 has an NBI inventory load rating of 40.8 metric tons.
Who is responsible for maintaining Silver Lakes PCT 2?
Silver Lakes PCT 2 is owned and maintained by County Highway Agency.
How old is Silver Lakes PCT 2 and does age affect safety?
Silver Lakes PCT 2 was built in 2003, making it 23 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.