FHWA NBI 2024 Inspection record Public-domain dataset

PR 22 WESTBOUND

Carrying PR 22 WESTBOUND over DEPRESSION

2.40 SE. OF VEGA BAJA, Vega Baja, Puerto Rico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: PR 22 WESTBOUND

The PR 22 WESTBOUND bridge in Vega Baja, Puerto Rico carries PR 22 WESTBOUND over DEPRESSION. It was built in 1995, making it 31 years old today. The structure is built primarily of prestressed concrete and spans 23 sections, stretching 874.6 meters (2870 feet) end to end. Daily traffic averages 32,550 vehicles, placing it in the heavily-trafficked tier of Puerto Rico bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 44.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PR 22 WESTBOUND compares

▲ 8.4
Load rating vs Puerto Rico average (36.1 t)
Top 29%
Higher load rating than 71% of Puerto Rico bridges
23
Bridges in Vega Baja · 3 in Poor condition
PR 22 WESTBOUND 44.5 t
Puerto Rico average 36.1 t

Live comparison across Puerto Rico.

Historical Sufficiency Rating

PlainBridge-computed
97.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
13.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
44.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Prestressed Concrete
Number of Spans
23
Structure Length
874.6 m (2870 ft)
Deck Width
14.2 m (47 ft)
Owner
State Toll Authority
Avg Daily Traffic
32,550 vehicles/day
Structure Number
023462

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether PR 22 WESTBOUND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PR 22 WESTBOUND against other structures in Vega Baja and across Puerto Rico. Puerto Rico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PR 22 WESTBOUND?

PR 22 WESTBOUND in Vega Baja, Puerto Rico has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PR 22 WESTBOUND inspected?

PR 22 WESTBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 32,550 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PR 22 WESTBOUND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PR 22 WESTBOUND?

PR 22 WESTBOUND has an NBI inventory load rating of 44.5 metric tons.

Who is responsible for maintaining PR 22 WESTBOUND?

PR 22 WESTBOUND is owned and maintained by State Toll Authority.

How old is PR 22 WESTBOUND and does age affect safety?

PR 22 WESTBOUND was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.