FHWA NBI 2024 Inspection record Public-domain dataset

Read BLVD

Carrying Read BLVD over MORRISON CANAL

1.0MI.N.OF I-10, Orleans, Louisiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: Read BLVD

The Read BLVD bridge in Orleans, Louisiana carries Read BLVD over MORRISON CANAL. It was built in 1960, making it 66 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 14.9 meters (49 feet) end to end. Average daily traffic is not reported for this structure. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 19.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Read BLVD compares

▼ 13.2
Load rating vs Louisiana average (32.3 t)
Bottom 14%
Lower load rating than 86% of Louisiana bridges
382
Bridges in Orleans · 32 in Poor condition
Read BLVD 19.1 t
Louisiana average 32.3 t

Live comparison across Louisiana.

Historical Sufficiency Rating

PlainBridge-computed
57.2 / 100 - historical 50–79.9 band
Structural adequacy /55
14.2
Serviceability /30
28.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Material
Concrete
Number of Spans
3
Structure Length
14.9 m (49 ft)
Deck Width
14.4 m (47 ft)
Owner
City/Municipal Highway Agency
Structure Number
023630026895982

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

Read BLVD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Read BLVD against other structures in Orleans and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Read BLVD?

Read BLVD in Orleans, Louisiana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is Read BLVD inspected?

Read BLVD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Read BLVD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Read BLVD?

Read BLVD has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining Read BLVD?

Read BLVD is owned and maintained by City/Municipal Highway Agency.

How old is Read BLVD and does age affect safety?

Read BLVD was built in 1960, making it 66 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.