FHWA NBI 2024 Inspection record Public-domain dataset

FAS341 CH3 MELVIN

Carrying FAS341 CH3 MELVIN over STREAM

1480E, 1200N, Ford, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: FAS341 CH3 MELVIN

The FAS341 CH3 MELVIN bridge in Ford, Illinois carries FAS341 CH3 MELVIN over STREAM. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 28.0 meters (92 feet) end to end. Daily traffic averages 475 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAS341 CH3 MELVIN compares

▼ 2.2
Load rating vs Illinois average (34.6 t)
Bottom 23%
Lower load rating than 77% of Illinois bridges
300
Bridges in Ford · 19 in Poor condition
FAS341 CH3 MELVIN 32.4 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
97.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.2
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Concrete Continuous
Number of Spans
3
Structure Length
28.0 m (92 ft)
Deck Width
9.3 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
475 vehicles/day
Structure Number
027338200000000

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether FAS341 CH3 MELVIN is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAS341 CH3 MELVIN against other structures in Ford and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAS341 CH3 MELVIN?

FAS341 CH3 MELVIN in Ford, Illinois has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FAS341 CH3 MELVIN inspected?

FAS341 CH3 MELVIN's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 475 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAS341 CH3 MELVIN is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAS341 CH3 MELVIN?

FAS341 CH3 MELVIN has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining FAS341 CH3 MELVIN?

FAS341 CH3 MELVIN is owned and maintained by County Highway Agency.

How old is FAS341 CH3 MELVIN and does age affect safety?

FAS341 CH3 MELVIN was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.