FHWA NBI 2024 Inspection record Public-domain dataset

NH175

Carrying NH175 over PEMIGEWASSET RIVER

0.6 MI EAST JCT US 3, Grafton, New Hampshire

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: NH175

The NH175 bridge in Grafton, New Hampshire carries NH175 over PEMIGEWASSET RIVER. It was built in 1976, making it 50 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 97.5 meters (320 feet) end to end. Daily traffic averages 672 vehicles, placing it in the lower-traffic tier of New Hampshire bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 28.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NH175 compares

▼ 9.3
Load rating vs New Hampshire average (38.2 t)
Bottom 29%
Lower load rating than 71% of New Hampshire bridges
544
Bridges in Grafton · 43 in Poor condition
NH175 28.9 t
New Hampshire average 38.2 t

Live comparison across New Hampshire.

Historical Sufficiency Rating

PlainBridge-computed
69.2 / 100 - historical 50–79.9 band
Structural adequacy /55
27.9
Serviceability /30
28.0
Essentiality /15
14.3
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
28.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Steel Continuous
Number of Spans
3
Structure Length
97.5 m (320 ft)
Deck Width
10.5 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
672 vehicles/day
Structure Number
028401950009300

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

NH175 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare NH175 against other structures in Grafton and across New Hampshire. New Hampshire bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NH175?

NH175 in Grafton, New Hampshire has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is NH175 inspected?

NH175's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 672 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NH175 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NH175?

NH175 has an NBI inventory load rating of 28.9 metric tons.

Who is responsible for maintaining NH175?

NH175 is owned and maintained by State Highway Agency.

How old is NH175 and does age affect safety?

NH175 was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.