FHWA NBI 2024 Inspection record Public-domain dataset

SR 225

Carrying SR 225 over BURNETT CREEK

01.95 S SR 43, Tippecanoe, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
36 t Inventory load rating

Bridge Snapshot: SR 225

The SR 225 bridge in Tippecanoe, Indiana carries SR 225 over BURNETT CREEK. It was built in 1972, making it 54 years old today. It was last reconstructed in 1995, extending its service life. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 47.2 meters (155 feet) end to end. Daily traffic averages 971 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 36.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 225 compares

▲ 0.4
Load rating vs Indiana average (35.6 t)
Top 36%
Higher load rating than 64% of Indiana bridges
329
Bridges in Tippecanoe · 17 in Poor condition
SR 225 36.0 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
93.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
24.0
Essentiality /15
14.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Last Reconstructed
1995
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
47.2 m (155 ft)
Deck Width
13.6 m (45 ft)
Owner
State Highway Agency
Avg Daily Traffic
971 vehicles/day
Structure Number
029160

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 225 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 225 against other structures in Tippecanoe and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 225?

SR 225 in Tippecanoe, Indiana has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 225 inspected?

SR 225's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 971 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 225 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 225?

SR 225 has an NBI inventory load rating of 36.0 metric tons.

Who is responsible for maintaining SR 225?

SR 225 is owned and maintained by State Highway Agency.

How old is SR 225 and does age affect safety?

SR 225 was built in 1972, making it 54 years old and last reconstructed in 1995.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.