FHWA NBI 2024 Inspection record Public-domain dataset

FDR 25

Carrying FDR 25 over BLACK RIVER

5 MI N/O 25R RD INT, Greenlee, Arizona

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
15 t Inventory load rating

Bridge Snapshot: FDR 25

The FDR 25 bridge in Greenlee, Arizona carries FDR 25 over BLACK RIVER. It was built in 1961, making it 65 years old today. The structure is built primarily of concrete and spans 5 sections, stretching 50.0 meters (164 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Arizona bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 14.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FDR 25 compares

▼ 32.5
Load rating vs Arizona average (47.4 t)
Bottom 1%
Lower load rating than 99% of Arizona bridges
47
Bridges in Greenlee · 3 in Poor condition
FDR 25 14.9 t
Arizona average 47.4 t

Live comparison across Arizona.

Historical Sufficiency Rating

PlainBridge-computed
67.9 / 100 - historical 50–79.9 band
Structural adequacy /55
31.2
Serviceability /30
25.0
Essentiality /15
14.7
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
14.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1961
Material
Concrete
Number of Spans
5
Structure Length
50.0 m (164 ft)
Deck Width
9.4 m (31 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
100 vehicles/day
Structure Number
030101000003277

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

FDR 25 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FDR 25 against other structures in Greenlee and across Arizona. Arizona bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FDR 25?

FDR 25 in Greenlee, Arizona has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FDR 25 inspected?

FDR 25's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FDR 25 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FDR 25?

FDR 25 has an NBI inventory load rating of 14.9 metric tons.

Who is responsible for maintaining FDR 25?

FDR 25 is owned and maintained by U.S. Forest Service.

How old is FDR 25 and does age affect safety?

FDR 25 was built in 1961, making it 65 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.