FHWA NBI 2024 Inspection record Public-domain dataset

OR 213 (HWY 160)

Carrying OR 213 (HWY 160) over Marquam Creek

019 MI N CLACK MARION LN, Clackamas, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
49 t Inventory load rating

Bridge Snapshot: OR 213 (HWY 160)

The OR 213 (HWY 160) bridge in Clackamas, Oregon carries OR 213 (HWY 160) over Marquam Creek. It was built in 1985, making it 41 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.0 meters (36 feet) end to end. Daily traffic averages 4,698 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 48.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OR 213 (HWY 160) compares

▲ 16.6
Load rating vs Oregon average (32.3 t)
Top 13%
Higher load rating than 87% of Oregon bridges
367
Bridges in Clackamas · 9 in Poor condition
OR 213 (HWY 160) 48.9 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
94.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
11.5
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
48.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.0 m (36 ft)
Deck Width
13.4 m (44 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,698 vehicles/day
Structure Number
03044A160 02234

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 213 (HWY 160) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 213 (HWY 160) against other structures in Clackamas and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 213 (HWY 160)?

OR 213 (HWY 160) in Clackamas, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is OR 213 (HWY 160) inspected?

OR 213 (HWY 160)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,698 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 213 (HWY 160) is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 213 (HWY 160)?

OR 213 (HWY 160) has an NBI inventory load rating of 48.9 metric tons.

Who is responsible for maintaining OR 213 (HWY 160)?

OR 213 (HWY 160) is owned and maintained by State Highway Agency.

How old is OR 213 (HWY 160) and does age affect safety?

OR 213 (HWY 160) was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.