FHWA NBI 2024 Inspection record Public-domain dataset

FSR 150

Carrying FSR 150 over BLACK CANYON TRIBUTARY

1 M E/O BLACK CANYON CAMP, Grant, New Mexico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
21 t Inventory load rating

Bridge Snapshot: FSR 150

The FSR 150 bridge in Grant, New Mexico carries FSR 150 over BLACK CANYON TRIBUTARY. It was built in 2018, making it 8 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 7.2 meters (24 feet) end to end. Daily traffic averages 399 vehicles, placing it in the lower-traffic tier of New Mexico bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 21.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FSR 150 compares

▼ 13.7
Load rating vs New Mexico average (34.8 t)
Bottom 10%
Lower load rating than 90% of New Mexico bridges
7
Bridges in Grant
FSR 150 21.1 t
New Mexico average 34.8 t

Live comparison across New Mexico.

Historical Sufficiency Rating

PlainBridge-computed
59.0 / 100 - historical 50–79.9 band
Structural adequacy /55
42.6
Serviceability /30
11.0
Essentiality /15
10.3
Special reductions
−4.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
21.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2018
Material
Prestressed Concrete
Number of Spans
1
Structure Length
7.2 m (24 ft)
Deck Width
5.1 m (17 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
399 vehicles/day
Structure Number
030605000014370

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FSR 150 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FSR 150 against other structures in Grant and across New Mexico. New Mexico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FSR 150?

FSR 150 in Grant, New Mexico has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is FSR 150 inspected?

FSR 150's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 399 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FSR 150 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FSR 150?

FSR 150 has an NBI inventory load rating of 21.1 metric tons.

Who is responsible for maintaining FSR 150?

FSR 150 is owned and maintained by U.S. Forest Service.

How old is FSR 150 and does age affect safety?

FSR 150 was built in 2018, making it 8 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.