FHWA NBI 2024 Inspection record Public-domain dataset

FDR 72

Carrying FDR 72 over ANCHO GULCH

7.3 MI SE/O A036 JTC, Lincoln, New Mexico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
17 t Inventory load rating

Bridge Snapshot: FDR 72

The FDR 72 bridge in Lincoln, New Mexico carries FDR 72 over ANCHO GULCH. It was built in 1958, making it 68 years old today. The structure is built primarily of concrete and spans 1 section, stretching 7.0 meters (23 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of New Mexico bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 16.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FDR 72 compares

▼ 18.0
Load rating vs New Mexico average (34.8 t)
Bottom 5%
Lower load rating than 95% of New Mexico bridges
6
Bridges in Lincoln
FDR 72 16.8 t
New Mexico average 34.8 t

Live comparison across New Mexico.

Historical Sufficiency Rating

PlainBridge-computed
60.9 / 100 - historical 50–79.9 band
Structural adequacy /55
35.0
Serviceability /30
14.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
16.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1958
Material
Concrete
Number of Spans
1
Structure Length
7.0 m (23 ft)
Deck Width
4.9 m (16 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
100 vehicles/day
Structure Number
030801000001104

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether FDR 72 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FDR 72 against other structures in Lincoln and across New Mexico. New Mexico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FDR 72?

FDR 72 in Lincoln, New Mexico has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FDR 72 inspected?

FDR 72's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FDR 72 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FDR 72?

FDR 72 has an NBI inventory load rating of 16.8 metric tons.

Who is responsible for maintaining FDR 72?

FDR 72 is owned and maintained by U.S. Forest Service.

How old is FDR 72 and does age affect safety?

FDR 72 was built in 1958, making it 68 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.