FHWA NBI 2024 Inspection record Public-domain dataset

SH 240

Carrying SH 240 over GILBERT CREEK

1.20 MI SE OF IH 44, Wichita, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: SH 240

The SH 240 bridge in Wichita, Texas carries SH 240 over GILBERT CREEK. It was built in 1920, making it 106 years old today. It was last reconstructed in 1949, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 2,275 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 25.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 240 compares

▼ 2.9
Load rating vs Texas average (28.3 t)
Top 49%
Higher load rating than 51% of Texas bridges
399
Bridges in Wichita · 3 in Poor condition
SH 240 25.4 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
85.6 / 100 - historical 80–100 band
Structural adequacy /55
49.0
Serviceability /30
25.0
Essentiality /15
14.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
25.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1920
Last Reconstructed
1949
Material
Steel
Number of Spans
1
Structure Length
36.6 m (120 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,275 vehicles/day
Structure Number
032430015602003

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether SH 240 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 240 against other structures in Wichita and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 240?

SH 240 in Wichita, Texas has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SH 240 inspected?

SH 240's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,275 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 240 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 240?

SH 240 has an NBI inventory load rating of 25.4 metric tons.

Who is responsible for maintaining SH 240?

SH 240 is owned and maintained by State Highway Agency.

How old is SH 240 and does age affect safety?

SH 240 was built in 1920, making it 106 years old and last reconstructed in 1949.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.